CASE STUDIES
Bakers Coaches
Client
Bakers Coaches, Biddulph
Brief
Coach depot/workshop and offices - Full design and build
The design
From initial consultation and design engineering, through to manufacture and erection of a new, fully insulated steel-framed building including foundations, office fit out, walls and floors.
The building has been designed to be in keeping with a newly developed business park. A Ward Composite roof and Ward Insulated Micro Rib Flat Panels are used on the vertical elevations to fulfil the design brief.
